The article can be read in full at Pittsburgh Business Times.
“Green Building – Mill 19 by RIDC. With the adaptive reuse of the quarter mile long Mill 19 at the former Jones and Laughlin site in Hazelwood, RIDC set out to make a world-class commercial and light industrial building. In contrast to the pollution produced by the original facility when it was a roll mill, Mill 19’s Phase A, as well its two subsequent phases, have been designed to be eco-friendly, environmentally sustainable and LEED v4 Gold certified.”