Contact Broker

Michael Heinricher

Director of Asset Management

Sandy Cikovic

Leasing Vice President

Property Details

Park Highlights:

  • Pad-ready sites from 2 to 20 acres
  • Convenient location along Route 28 at exit 18
  • 30 minutes north of Pittsburgh and 19 miles from PA Turnpike
  • Only quadrant of interchange with infrastructure
  • Integrated storm water management system connections available
  • All utilities located at curb
  • 138kV networked substation on-site; loop feed capable; exceeds PA PUC requirements for reliability
  • Fully redundant fiber optic ring with no single point of failure; dedicated dark fiber available
  • Situated at the entrance of a growing office and light industrial park

Property Specs

Total Space Available

Building Size

Transaction type

Sale

Type of Space

Flex

Neighborhood

Armstrong

Associated Park

Brochure

In the News

Interested? Contact Us

Our Developments

Our region’s map is dotted with projects developed by RIDC. Learn more about how we’ve connected businesses and organizations to facilities built to transform their futures.