Park Highlights:
- Pad-ready sites from 2 to 20 acres
- Keystone Opportunity Zone Tax Incentives for up to 10 years
- Convenient location along Route 28 at exit 18
- 30 minutes north of Pittsburgh and 19 miles from PA Turnpike
- Only quadrant of interchange with infrastructure
- Fully permitted including existing NPES permit
- Integrated storm water management system connections available
- All utilities located at curb
- 138kV networked substation on-site; loop feed capable; exceeds PA PUC requirements for reliability
- Fully redundant fiber optic ring with no single point of failure; dedicated dark fiber available
- Scenic views from walking trails and sidewalks
- Situated at the entrance of a growing office and light industrial park
- Park tenants include universities, fortune 500 companies, as well as local and regional businesses